Elephantgemsproject.org
Domain Summary
What is the traffic rank for Elephantgemsproject.org?
• Elephantgemsproject.org ranks #13,394,128 globally on HypeStat.
What IP addresses does Elephantgemsproject.org resolve to?
• Elephantgemsproject.org resolves to the IP addresses 50.63.202.62.
Where are Elephantgemsproject.org servers located in?
• Elephantgemsproject.org has servers located in Scottsdale, Arizona, 85260, United States.
elephantgemsproject.org Profile
What technologies does elephantgemsproject.org use?
These are the technologies used at elephantgemsproject.org. elephantgemsproject.org has a total of 16 technologies installed in 12 different categories.elephantgemsproject.org Traffic Analysis
Elephantgemsproject.org is ranked #13,394,128 in the world.Daily Visitors n/a
Monthly Visits n/a
Pages per Visit n/a
Visit duration n/a
Bounce Rate n/a
Is this your site?Verify your site's metrics.
- Daily Unique Visitors:
- n/a
- Monthly Visits:
- n/a
- Pages per Visit:
- n/a
- Daily Pageviews:
- n/a
- Avg. visit duration:
- n/a
- Bounce rate:
- n/a
- Global Reach:
- n/a
- HypeRank:
- 13,394,128
Last update was 1972 days ago
This can take up to 60 seconds. Please wait...
This can take up to 60 seconds. Please wait...
*HypeStat.com is not promoting or affiliated with elephantgemsproject.org in any way. Only publicly available statistics data are displayed.
▼
SEMrush is a complete on line advertising and marketing platform that gives a extensive variety of gear and functions to help companies and entrepreneurs in enhancing their on line visibility and optimizing their virtual advertising and marketing strategies.- Domain:
- elephantgemsproject.org
- Rank:
(Rank based on keywords, cost and organic traffic) - n/a
- Organic Keywords:
(Number of keywords in top 20 Google SERP) - 0
- Organic Traffic:
(Number of visitors coming from top 20 search results) - 0
- Organic Cost:
((How much need to spend if get same number of visitors from Google Adwords) - $0.00
Ad Experience Report ▼
Summary of the ad experience rating of a website for a specific platform.Mobile summary
- Root domain:
- elephantgemsproject.org
- Ad filtering:
(Chrome is not filtering ads on your site.) - Off
- Status:
(The status of the site that is reviewed for the Better Ads Standards.) - Not reviewed
Desktop summary
- Root domain:
- elephantgemsproject.org
- Ad filtering:
(Chrome is not filtering ads on your site.) - Off
- Status:
(The status of the site that is reviewed for the Better Ads Standards.) - Not reviewed
Abusive Experience Report ▼
Summary of the abusive experience rating of a website.- Root domain:
- elephantgemsproject.org
- Enforcement:
(Chrome is not preventing your site from opening new windows or tabs.) - Off
- Status:
(The status of the site reviewed for the abusive experiences.) - Not reviewed
Where is elephantgemsproject.org hosted? ▼
Elephantgemsproject.org may be hosted in multiple data centers distributed in different locations around the world. This is probably just one of them.- Server IP:
- 50.63.202.62
- ASN:
- AS26496
- ISP:
- GoDaddy.com, LLC
- Server Location:
- Scottsdale
Arizona, AZ
85260
United States, US
Other sites hosted on 50.63.202.62
Does elephantgemsproject.org use compression? ▼
Website compression is the process of reducing the size of website files, such as HTML, CSS, JavaScript, and image files, to improve website performance and load times. Compressing website files can significantly reduce the amount of data that needs to be transferred from the server to the user's browser, resulting in faster page load times and improved user experience.
elephantgemsproject.org use gzip compression.
Original size: 489 B
Compressed size: 489 B
File reduced by: n/a
Compressed size: 489 B
File reduced by: n/a
Google Safe Browsing ▼
Google Safe Browsing is a service provided by Google that helps protect users from visiting websites that may contain malicious or harmful content, such as malware, phishing attempts, or deceptive software.SSL Checker - SSL Certificate Verify ▼
An SSL (Secure Sockets Layer) certificate is a digital certificate that establishes a secure encrypted connection between a web server and a user's web browser. It provides authentication and encryption, ensuring that data transmitted between the server and the browser remains private and protected. elephantgemsproject.org does not support HTTPS. elephantgemsproject.org does not support HTTPS
Verifying SSL Support. Please wait...
Verify HTTP/2 Support ▼
HTTP/2 (Hypertext Transfer Protocol version 2) is a major revision of the HTTP protocol, which is the foundation of data communication on the World Wide Web. It was developed as an improvement over the previous HTTP/1.1 version to enhance web performance and efficiency. elephantgemsproject.org does not support HTTP/2
Verifying HTTP/2.0 Support. Please wait...
Http Header ▼
HTTP headers are extra portions of records despatched among a consumer (which include an internet browser) and a server at some stage in an HTTP request or response. They offer instructions, metadata, or manipulate parameters for the conversation among the consumer and server.Server: nginx
Date: Mon, 26 Aug 2019 18:49:02 GMT
Content-Type: text/html; charset=utf-8
Content-Length: 52
Connection: keep-alive
Location: http://www.upcreativellc.com/
X-Served-By: Namecheap URL Forward
HTTP/1.1 200 OK
Server: nginx
Date: Mon, 26 Aug 2019 18:49:04 GMT
Content-Type: text/html; charset=utf-8
Transfer-Encoding: chunked
Connection: keep-alive
Keep-Alive: timeout=15
Cache-Control: no-cache
Pragma: no-cache
Expires: -1
X-CST: MISS
X-CST: MISS
Allow: GET, HEAD
Connection: close
Pragma: no-cache
cache-control: no-cache
Location: /VLbUM/
HTTP/1.1 302 Found
Connection: close
Pragma: no-cache
cache-control: no-cache
Location: /
HTTP/1.1 200 OK
Cache-Control: no-cache
Pragma: no-cache
Content-Type: text/html; charset=utf-8
Content-Encoding: gzip
Expires: -1
Vary: Accept-Encoding
Server: Microsoft-IIS/7.5
X-AspNet-Version: 4.0.30319
X-Powered-By: ASP.NET
Date: Mon, 26 Aug 2019 18:49:05 GMT
Content-Length: 454
Age: 11
Connection: keep-alive
Date: Mon, 26 Aug 2019 18:49:09 GMT
Content-Type: text/html; charset=UTF-8
Transfer-Encoding: chunked
Connection: keep-alive
Set-Cookie: __cfduid=d615599e25e24a57b13527c43c52070421566845348; expires=Tue, 25-Aug-20 18:49:08 GMT; path=/; domain=.slotsempires.com; HttpOnly
X-Powered-By: PHP/7.2.19
X-Redirect-By: WordPress
Location: https://slotsempires.com/
Vary: User-Agent
Server: cloudflare
CF-RAY: 50c7fbe58cb7c63b-MSP
HTTP/2 200
date: Mon, 26 Aug 2019 18:49:11 GMT
content-type: text/html; charset=UTF-8
set-cookie: __cfduid=dc9675f13c293fccf16a14b14693d6f611566845349; expires=Tue, 25-Aug-20 18:49:09 GMT; path=/; domain=.slotsempires.com; HttpOnly
x-powered-by: PHP/7.2.19
link: <https://slotsempires.com/wp-json/>; rel="https://api.w.org/", <https://slotsempires.com/>; rel=shortlink
vary: Accept-Encoding,User-Agent
expect-ct: max-age=604800, report-uri="https://report-uri.cloudflare.com/cdn-cgi/beacon/expect-ct"
server: cloudflare
cf-ray: 50c7fbeaae55c643-MSP
content-encoding: br
Date: Mon, 26 Aug 2019 18:49:13 GMT
Content-Type: text/html
Transfer-Encoding: chunked
Connection: keep-alive
Set-Cookie: __cfduid=d5440cbdb6baa6b223916473ed78f099f1566845353; expires=Tue, 25-Aug-20 18:49:13 GMT; path=/; domain=.conscatum.press; HttpOnly
Location: https://dekoeko.com/
Server: cloudflare
CF-RAY: 50c7fc021da3c627-MSP
HTTP/1.1 200 OK
Server: nginx/1.14.0 (Ubuntu)
Date: Mon, 26 Aug 2019 18:49:15 GMT
Content-Type: text/html; charset=utf-8
Transfer-Encoding: chunked
Connection: keep-alive
X-Frame-Options: SAMEORIGIN
X-XSS-Protection: 1; mode=block
X-Content-Type-Options: nosniff
X-Download-Options: noopen
X-Permitted-Cross-Domain-Policies: none
Referrer-Policy: strict-origin-when-cross-origin
ETag: W/"1b64efdcaf0648952cbcb4373b807a5c"
Cache-Control: max-age=0, private, must-revalidate
Set-Cookie: guest_token=IkxoTzlISFJmVk5SMWdFUzhiVjdTcGcxNTY2ODQ1MzU0MzA5Ig%3D%3D--9d6a6f0deeae063a53e5ebadd593a4f010ca0abf; path=/; expires=Fri, 26 Aug 2039 18:49:14 -0000; HttpOnly
Set-Cookie: _dekoeko2_session=wpbvlf1d01UTcvye040tVRZIeAZ4NJ2ckpYAvZVhZJs22V8eGglttArPadx2yk0Ougn2TGiT6xdVUMjJMS6I2pf%2BOX0rERDPruNeOuyfr%2B0OTXFhBWhdjtEMZakRuqhTEMstM6E49rdeHT0kg3U%3D--Y8FbnM8VRBPyEmfJ--HyjbU4%2Fw7cKANsj%2BWfj45g%3D%3D; path=/; HttpOnly
X-Request-Id: fd6a80be-363f-4165-aa9c-fc93796f9def
X-Runtime: 0.889191
Vary: Origin
Content-Encoding: gzip
Connection: close
Pragma: no-cache
cache-control: no-cache
Location: /lkmKh/
HTTP/1.1 302 Found
Connection: close
Pragma: no-cache
cache-control: no-cache
Location: /
HTTP/1.1 200 OK
Cache-Control: no-cache
Pragma: no-cache
Content-Type: text/html; charset=utf-8
Expires: -1
Server: Microsoft-IIS/7.5
X-AspNet-Version: 4.0.30319
X-Powered-By: ASP.NET
Date: Mon, 26 Aug 2019 18:49:16 GMT
Content-Length: 473
Age: 2
Connection: keep-alive
Date: Mon, 26 Aug 2019 18:49:18 GMT
Server: Apache
X-Redirect-By: WordPress
Location: http://www.perfectcolorandcut.com/
Transfer-Encoding: chunked
Content-Type: text/html; charset=UTF-8
HTTP/1.1 200 OK
Date: Mon, 26 Aug 2019 18:49:19 GMT
Server: Apache
Link: <http://www.perfectcolorandcut.com/wp-json/>; rel="https://api.w.org/"
Transfer-Encoding: chunked
Content-Type: text/html; charset=UTF-8
Date: Mon, 26 Aug 2019 18:49:21 GMT
Server: Apache/2.4.18 (Ubuntu)
Location: http://www.3302thewresidences.com/
Content-Length: 330
Content-Type: text/html; charset=iso-8859-1
HTTP/1.1 200 OK
Accept-Ranges: bytes
Age: 4182
Cache-Control: public, max-age=32400
Content-Encoding: gzip
Content-Language: en
Content-Type: text/html; charset=utf-8
Date: Mon, 26 Aug 2019 17:39:40 GMT
Etag: "1566841178-0"
Expires: Sun, 19 Nov 1978 05:00:00 GMT
Last-Modified: Mon, 26 Aug 2019 17:39:38 GMT
Link: <http://thewresidences3302.3302thewresidences.com>; rel="shortlink",<http://3302thewresidences.com>; rel="canonical"
Server: nginx
Vary: Cookie,Accept-Encoding
Via: varnish
X-AH-Environment: prod
X-Cache: HIT
X-Cache-Hits: 1
X-Content-Type-Options: nosniff
X-Drupal-Cache: MISS
X-Frame-Options: SAMEORIGIN
X-Generator: Drupal 7 (http://drupal.org)
X-Request-ID: v-7a127e82-c828-11e9-8310-22000a3fabea
Content-Length: 19736
Connection: keep-alive
Set-Cookie: rd=R3047006314; path=/; expires=Thu, 29-Aug-2019 06:59:07 GMT
Server: nginx
Date: Mon, 26 Aug 2019 18:49:23 GMT
Content-Type: text/html
Content-Length: 154
Connection: close
Location: http://www.mathues.pro
HTTP/1.1 200 OK
Set-Cookie: rd=R3047008492; path=/; expires=Thu, 29-Aug-2019 07:04:19 GMT
Server: nginx
Date: Mon, 26 Aug 2019 18:49:24 GMT
Content-Type: text/html; charset=UTF-8
Transfer-Encoding: chunked
Connection: close
Server: Tengine
Date: Mon, 26 Aug 2019 18:50:39 GMT
Content-Type: text/html
Content-Length: 589
Connection: close
Date: Mon, 26 Aug 2019 18:49:43 GMT
Content-Type: text/html
Content-Length: 15412
Connection: keep-alive
Last-Modified: Sun, 16 Jun 2019 00:23:30 GMT
Accept-Ranges: none
Vary: Range,Accept-Encoding
Content-Encoding: gzip
Server: Apache
Connection: close
Pragma: no-cache
cache-control: no-cache
Location: /mhaTl/
HTTP/1.1 302 Found
Connection: close
Pragma: no-cache
cache-control: no-cache
Location: /
HTTP/1.1 200 OK
Cache-Control: no-cache
Pragma: no-cache
Content-Type: text/html; charset=utf-8
Content-Encoding: gzip
Expires: -1
Vary: Accept-Encoding
Server: Microsoft-IIS/7.5
X-AspNet-Version: 4.0.30319
X-Powered-By: ASP.NET
Date: Mon, 26 Aug 2019 18:49:44 GMT
Content-Length: 470
Age: 4
Connection: keep-alive
Date: Mon, 26 Aug 2019 18:50:23 GMT
Server: Apache
Last-Modified: Tue, 13 Aug 2019 08:38:04 GMT
ETag: "1c98-58ffb8f1a9300-gzip"
Accept-Ranges: bytes
Vary: Accept-Encoding
Content-Encoding: gzip
Content-Length: 2790
Connection: close
Content-Type: text/html
Server: nginx/1.12.2
Date: Mon, 26 Aug 2019 18:49:47 GMT
Content-Type: text/html; charset=utf-8
Transfer-Encoding: chunked
Connection: close
Location: http://www.farmasius.com/Lyndsaybetts/default
HTTP/1.1 301 Moved permanently
Location: https://www.farmasius.com/Lyndsaybetts/default
Connection: close
Cache-Control: no-cache
Pragma: no-cache
HTTP/1.1 200 OK
Cache-Control: private
Content-Type: text/html; charset=utf-8
Server: Microsoft-IIS/10.0
Set-Cookie: ASP.NET_SessionId=rqfekv0bk5mhfnbrxmejmnk4; path=/; HttpOnly
X-AspNet-Version: 4.0.30319
X-Powered-By: ASP.NET
Date: Mon, 26 Aug 2019 18:49:47 GMT
Content-Length: 111153
Set-Cookie: NSC_gbsnbtjvt.dpn=ffffffffaf181a5645525d5f4f58455e445a4a423660;path=/;secure;httponly
Connection: close
Pragma: no-cache
cache-control: no-cache
Location: /PVLOT/
HTTP/1.1 302 Found
Connection: close
Pragma: no-cache
cache-control: no-cache
Location: /
HTTP/1.1 200 OK
Cache-Control: no-cache
Pragma: no-cache
Content-Type: text/html; charset=utf-8
Expires: -1
Server: Microsoft-IIS/7.5
X-AspNet-Version: 4.0.30319
X-Powered-By: ASP.NET
Date: Mon, 26 Aug 2019 18:49:52 GMT
Content-Length: 489
Age: 11
Connection: keep-alive
DNS Lookup ▼
DNS entries (Domain Name System) are a critical component of the Internet infrastructure. They act as directories that translate human-readable domain names (such as example.com) to machine-readable IP addresses. DNS records are stored on DNS servers and help forward internet traffic efficiently.Type | Ip | Target/Txt | TTL |
SOA | 3600 | ||
Mname | ns17.domaincontrol.com | ||
Rname | dns.jomax.net | ||
Serial Number | 2019061000 | ||
Refresh | 28800 | ||
Retry | 7200 | ||
Expire | 604800 | ||
Minimum TTL | 600 | ||
A | 50.63.202.33 | 600 | |
NS | 3599 | ||
NS | 3599 |