theclimatecommsproject.org Theclimatecommsproject.org

   
The Climate Communication Project

Domain Summary

What IP addresses does Theclimatecommsproject.org resolve to?

• Theclimatecommsproject.org resolves to the IP addresses 2001:8d8:100f:f000::256, 217.160.0.69.

Where are Theclimatecommsproject.org servers located in?

• Theclimatecommsproject.org has servers located in Germany.

theclimatecommsproject.org Profile

Title:The Climate Communication Project

What technologies does theclimatecommsproject.org use?

These are the technologies used at theclimatecommsproject.org. theclimatecommsproject.org has a total of 9 technologies installed in 8 different categories.

theclimatecommsproject.org Traffic Analysis

There's no enough data about theclimatecommsproject.org traffic.
Daily Visitors n/a
Monthly Visits n/a
Pages per Visit n/a
Visit duration n/a
Bounce Rate n/a
Is this your site?Verify your site's metrics.
Daily Unique Visitors:
 n/a
Monthly Visits:
n/a
Pages per Visit:
n/a
Daily Pageviews:
n/a
Avg. visit duration:
n/a
Bounce rate:
n/a
Global Reach:
 n/a
HypeRank:
n/a
SEMrush Rank:
12,441,719
*All traffic values are estimates only.
Last update was 10 days ago
     
This can take up to 60 seconds. Please wait...

*HypeStat.com is not promoting or affiliated with theclimatecommsproject.org in any way. Only publicly available statistics data are displayed.

 

SEMrush is a complete on line advertising and marketing platform that gives a extensive variety of gear and functions to help companies and entrepreneurs in enhancing their on line visibility and optimizing their virtual advertising and marketing strategies.
SemRushSemRush
Domain:
  theclimatecommsproject.org
Rank:
(Rank based on keywords, cost and organic traffic)
  12,441,719
Organic Keywords:
(Number of keywords in top 20 Google SERP)
  17
Organic Traffic:
(Number of visitors coming from top 20 search results)
  1
Organic Cost:
((How much need to spend if get same number of visitors from Google Adwords)
  $0.00

Ad Experience Report

Summary of the ad experience rating of a website for a specific platform.

Mobile summary

Root domain:
theclimatecommsproject.org
Ad filtering:
(Chrome is not filtering ads on your site.)
Off
Status:
(The status of the site that is reviewed for the Better Ads Standards.)
Not reviewed

Desktop summary

Root domain:
theclimatecommsproject.org
Ad filtering:
(Chrome is not filtering ads on your site.)
Off
Status:
(The status of the site that is reviewed for the Better Ads Standards.)
Not reviewed

Abusive Experience Report

Summary of the abusive experience rating of a website.
Root domain:
theclimatecommsproject.org
Enforcement:
(Chrome is not preventing your site from opening new windows or tabs.)
Off
Status:
(The status of the site reviewed for the abusive experiences.)
Not reviewed

Where is theclimatecommsproject.org hosted?

Theclimatecommsproject.org may be hosted in multiple data centers distributed in different locations around the world. This is probably just one of them.

How fast does theclimatecommsproject.org load?

The average loading time of theclimatecommsproject.org is 1602 ms. The Desktop speed index is 91 and mobile speed index is 50.
Average Load Time:
1602 ms

Page Speed (Google PageSpeed Insights) - Desktop

91
0-49 50-89 90-100 i

Field Data

Over the last 30 days, the field data shows that this page has a speed compared to other pages in the Chrome User Experience Report.We are showing the 90th percentile of FCP and the 95th percentile of FID.

Cumulative Layout Shift (CLS)0 0% of loads for this page have a fast (<0s) Cumulative Layout Shift (CLS) 0% 0% of loads for this page have an average (0s ~ 0s) Cumulative Layout Shift (CLS) 0% 0% of loads for this page have a slow (>0s) Cumulative Layout Shift (CLS) 0%
Time To First Byte (TTFB)0 0% of loads for this page have a fast (<0s) Time To First Byte (TTFB) 0% 0% of loads for this page have an average (0s ~ 0s) Time To First Byte (TTFB) 0% 0% of loads for this page have a slow (>0s) Time To First Byte (TTFB) 0%
First Contentful Paint (FCP)0 0% of loads for this page have a fast (<0s) First Contentful Paint (FCP) 0% 0% of loads for this page have an average (0s ~ 0s) First Contentful Paint (FCP) 0% 0% of loads for this page have a slow (>0s) First Contentful Paint (FCP) 0%
First Input Delay (FID)0 0% of loads for this page have a fast (<0ms) First Input Delay (FID) 0% 0% of loads for this page have an average (0ms ~ 0ms) First Input Delay (FID) 0% 0% of loads for this page have a slow (>0ms) First Input Delay (FID) 0%
Interaction To Next Paint (INP)0 0% of loads for this page have a fast (<0ms) Interaction To Next Paint (INP) 0% 0% of loads for this page have an average (0ms ~ 0ms) Interaction To Next Paint (INP) 0% 0% of loads for this page have a slow (>0ms) Interaction To Next Paint (INP) 0%
Largest Contentful Paint (LCP)0 0% of loads for this page have a fast (<0ms) Largest Contentful Paint (LCP) 0% 0% of loads for this page have an average (0ms ~ 0ms) Largest Contentful Paint (LCP) 0% 0% of loads for this page have a slow (>0ms) Largest Contentful Paint (LCP) 0%

Origin Data

All pages served from this origin have an speed compared to other pages in the Chrome User Experience Report. over the last 30 days.To view suggestions tailored to each page, analyze individual page URLs.

Cumulative Layout Shift (CLS)0 0% of loads for this page have a fast (<0s) Cumulative Layout Shift (CLS) 0% 0% of loads for this page have an average (0s ~ 0s) Cumulative Layout Shift (CLS) 0% 0% of loads for this page have a slow (>0s) Cumulative Layout Shift (CLS) 0%
Time To First Byte (TTFB)0 0% of loads for this page have a fast (<0s) Time To First Byte (TTFB) 0% 0% of loads for this page have an average (0s ~ 0s) Time To First Byte (TTFB) 0% 0% of loads for this page have a slow (>0s) Time To First Byte (TTFB) 0%
First Contentful Paint (FCP)0 0% of loads for this page have a fast (<0s) First Contentful Paint (FCP) 0% 0% of loads for this page have an average (0s ~ 0s) First Contentful Paint (FCP) 0% 0% of loads for this page have a slow (>0s) First Contentful Paint (FCP) 0%
First Input Delay (FID)0 0% of loads for this page have a fast (<0ms) First Input Delay (FID) 0% 0% of loads for this page have an average 0ms ~ 0ms) First Input Delay (FID) 0% 0% of loads for this page have a slow (>0ms) First Input Delay (FID) 0%
Interaction To Next Paint (INP)0 0% of loads for this page have a fast (<0ms) Interaction To Next Paint (INP) 0% 0% of loads for this page have an average (0ms ~ 0ms) Interaction To Next Paint (INP) 0% 0% of loads for this page have a slow (>0ms) Interaction To Next Paint (INP) 0%
Largest Contentful Paint (LCP)0 0% of loads for this page have a fast (<0ms) Largest Contentful Paint (LCP) 0% 0% of loads for this page have an average (0ms ~ 0ms) Largest Contentful Paint (LCP) 0% 0% of loads for this page have a slow (>0ms) Largest Contentful Paint (LCP) 0%

Lab Data

Largest Contentful Paint 1.0 s
Largest Contentful Paint marks the time at which the largest text or image is painted. Learn more about the Largest Contentful Paint metric
INP breakdown  
Start investigating with the longest subpart. To reduce processing duration, , often JS. Delays can be minimized optimize the main-thread costs
Max Potential First Input Delay 20 ms
The maximum potential First Input Delay that your users could experience is the duration of the longest task. Learn more about the Maximum Potential First Input Delay metric
First Contentful Paint 0.7 s
First Contentful Paint marks the time at which the first text or image is painted. Learn more about the First Contentful Paint metric
LCP request discovery  
Optimize LCP by making the LCP image from the HTML immediately, and discoverable avoiding lazy-loading
Lazy load third-party resources with facades  
Some third-party embeds can be lazy loaded. Consider replacing them with a facade until they are required. Learn how to defer third-parties with a facade
Speed Index 3.1 s
Speed Index shows how quickly the contents of a page are visibly populated. Learn more about the Speed Index metric
Preload Largest Contentful Paint image  
If the LCP element is dynamically added to the page, you should preload the image in order to improve LCP. Learn more about preloading LCP elements
Total Blocking Time 0 ms
Sum of all time periods between FCP and Time to Interactive, when task length exceeded 50ms, expressed in milliseconds. Learn more about the Total Blocking Time metric
Largest Contentful Paint image was not lazily loaded  
Above-the-fold images that are lazily loaded render later in the page lifecycle, which can delay the largest contentful paint. Learn more about optimal lazy loading
First Meaningful Paint  
First Meaningful Paint measures when the primary content of a page is visible. Learn more about the First Meaningful Paint metric
Time to Interactive 1.0 s
Time to Interactive is the amount of time it takes for the page to become fully interactive. Learn more about the Time to Interactive metric

Page Speed (Google PageSpeed Insights) - Mobile

50
0-49 50-89 90-100 i

Field Data

Over the last 30 days, the field data shows that this page has a speed compared to other pages in the Chrome User Experience Report.We are showing the 90th percentile of FCP and the 95th percentile of FID.

Cumulative Layout Shift (CLS)0 0% of loads for this page have a fast (<0s) Cumulative Layout Shift (CLS) 0% 0% of loads for this page have an average (0s ~ 0s) Cumulative Layout Shift (CLS) 0% 0% of loads for this page have a slow (>0s) Cumulative Layout Shift (CLS) 0%
Time To First Byte (TTFB)0 0% of loads for this page have a fast (<0s) Time To First Byte (TTFB) 0% 0% of loads for this page have an average (0s ~ 0s) Time To First Byte (TTFB) 0% 0% of loads for this page have a slow (>0s) Time To First Byte (TTFB) 0%
First Contentful Paint (FCP)0 0% of loads for this page have a fast (<0s) First Contentful Paint (FCP) 0% 0% of loads for this page have an average (0s ~ 0s) First Contentful Paint (FCP) 0% 0% of loads for this page have a slow (>0s) First Contentful Paint (FCP) 0%
First Input Delay (FID)0 0% of loads for this page have a fast (<0ms) First Input Delay (FID) 0% 0% of loads for this page have an average (0ms ~ 0ms) First Input Delay (FID) 0% 0% of loads for this page have a slow (>0ms) First Input Delay (FID) 0%
Interactive To Next Paint (INP)0 0% of loads for this page have a fast (<0s) Interactive To Next Paint (INP) 0% 0% of loads for this page have an average (0s ~ 0s) Interactive To Next Paint (INP) 0% 0% of loads for this page have a slow (>0s) Interactive To Next Paint (INP) 0%
Largest Contentful Paint (LCP)0 0% of loads for this page have a fast (<0s) Largest Contentful Paint (LCP) 0% 0% of loads for this page have an average (0s ~ 0s) Largest Contentful Paint (LCP) 0% 0% of loads for this page have a slow (>0s) Largest Contentful Paint (LCP) 0%

Origin Data

All pages served from this origin have an speed compared to other pages in the Chrome User Experience Report. over the last 30 days.To view suggestions tailored to each page, analyze individual page URLs.

Cumulative Layout Shift (CLS)0 0% of loads for this page have a fast (<0s) Cumulative Layout Shift (CLS) 0% 0% of loads for this page have an average (0s ~ 0s) Cumulative Layout Shift (CLS) 0% 0% of loads for this page have a slow (>0s) Cumulative Layout Shift (CLS) 0%
Time To First Byte (TTFB)0 0% of loads for this page have a fast (<0s) Time To First Byte (TTFB) 0% 0% of loads for this page have an average (0s ~ 0s) Time To First Byte (TTFB) 0% 0% of loads for this page have a slow (>0s) Time To First Byte (TTFB) 0%
First Contentful Paint (FCP)0 0% of loads for this page have a fast (<0s) First Contentful Paint (FCP) 0% 0% of loads for this page have an average (0s ~ 0s) First Contentful Paint (FCP) 0% 0% of loads for this page have a slow (>0s) First Contentful Paint (FCP) 0%
First Input Delay (FID)0 0% of loads for this page have a fast (<0ms) First Input Delay (FID) 0% 0% of loads for this page have an average 0ms ~ 0ms) First Input Delay (FID) 0% 0% of loads for this page have a slow (>0ms) First Input Delay (FID) 0%
Interactive To Next Paint (INP)0 0% of loads for this page have a fast (<0s) Interactive To Next Paint (INP) 0% 0% of loads for this page have an average (0s ~ 0s) Interactive To Next Paint (INP) 0% 0% of loads for this page have a slow (>0s) Interactive To Next Paint (INP) 0%
Largest Contentful Paint (LCP)0 0% of loads for this page have a fast (<0s)Largest Contentful Paint (LCP) 0% 0% of loads for this page have an average (0s ~ 0s)Largest Contentful Paint (LCP) 0% 0% of loads for this page have a slow (>0s)Largest Contentful Paint (LCP) 0%

Lab Data

Lazy load third-party resources with facades  
Some third-party embeds can be lazy loaded. Consider replacing them with a facade until they are required. Learn how to defer third-parties with a facade
Speed Index 7.2 s
Speed Index shows how quickly the contents of a page are visibly populated. Learn more about the Speed Index metric
Time to Interactive 4.3 s
Time to Interactive is the amount of time it takes for the page to become fully interactive. Learn more about the Time to Interactive metric
Max Potential First Input Delay 40 ms
The maximum potential First Input Delay that your users could experience is the duration of the longest task. Learn more about the Maximum Potential First Input Delay metric
Largest Contentful Paint 4.2 s
Largest Contentful Paint marks the time at which the largest text or image is painted. Learn more about the Largest Contentful Paint metric
INP breakdown  
Start investigating with the longest subpart. To reduce processing duration, , often JS. Delays can be minimized optimize the main-thread costs
Largest Contentful Paint image was not lazily loaded  
Above-the-fold images that are lazily loaded render later in the page lifecycle, which can delay the largest contentful paint. Learn more about optimal lazy loading
First Meaningful Paint  
First Meaningful Paint measures when the primary content of a page is visible. Learn more about the First Meaningful Paint metric
Total Blocking Time 0 ms
Sum of all time periods between FCP and Time to Interactive, when task length exceeded 50ms, expressed in milliseconds. Learn more about the Total Blocking Time metric
First Contentful Paint 3.3 s
First Contentful Paint marks the time at which the first text or image is painted. Learn more about the First Contentful Paint metric

Does theclimatecommsproject.org use compression?

Website compression is the process of reducing the size of website files, such as HTML, CSS, JavaScript, and image files, to improve website performance and load times. Compressing website files can significantly reduce the amount of data that needs to be transferred from the server to the user's browser, resulting in faster page load times and improved user experience. Files on theclimatecommsproject.org are reduced by 81%.
theclimatecommsproject.org use gzip compression.
Original size: 99.7 KB
Compressed size: 18.48 KB
File reduced by: 81.22 KB (81%)

Google Safe Browsing

Google Safe Browsing is a service provided by Google that helps protect users from visiting websites that may contain malicious or harmful content, such as malware, phishing attempts, or deceptive software.
This site is not currently listed as suspicious

MyWot.com Reputation Ratings

MyWOT (short for "My Web of Trust") is a web-based reputation and rating service that provides users with information about the trustworthiness and safety of websites.
Status:
  UNKNOWN

SSL Checker - SSL Certificate Verify

An SSL (Secure Sockets Layer) certificate is a digital certificate that establishes a secure encrypted connection between a web server and a user's web browser. It provides authentication and encryption, ensuring that data transmitted between the server and the browser remains private and protected. theclimatecommsproject.org supports HTTPS.
 theclimatecommsproject.org supports HTTPS
     
Verifying SSL Support. Please wait...
Common Name: *.theclimatecommsproject.org
Organization:
Location:
Issuer: Sectigo Public Server Authentication CA DV R36
Valid from: Aug 15 00:00:00 2025 GMT
Valid until: Aug 29 23:59:59 2026 GMT
Authority: CA:FALSE
Keysize: 2048 Bits
Common Name: Sectigo Public Server Authentication CA DV R36
Organization: Sectigo Limited
Location: GB
Issuer: Sectigo Public Server Authentication Root R46
Valid from: Mar 22 00:00:00 2021 GMT
Valid until: Mar 21 23:59:59 2036 GMT
Authority: CA:TRUE
Keysize: 3072 Bits
Common Name: Sectigo Public Server Authentication Root R46
Organization: Sectigo Limited
Location: GB
Issuer: USERTrust RSA Certification Authority
Valid from: Mar 22 00:00:00 2021 GMT
Valid until: Jan 18 23:59:59 2038 GMT
Authority: CA:TRUE
Keysize: 4096 Bits
Common Name: USERTrust RSA Certification Authority
Organization: The USERTRUST Network
Location: Jersey City, New Jersey, US
Issuer: AAA Certificate Services
Valid from: Mar 12 00:00:00 2019 GMT
Valid until: Dec 31 23:59:59 2028 GMT
Authority: CA:TRUE
Keysize: 4096 Bits

Verify HTTP/2 Support

HTTP/2 (Hypertext Transfer Protocol version 2) is a major revision of the HTTP protocol, which is the foundation of data communication on the World Wide Web. It was developed as an improvement over the previous HTTP/1.1 version to enhance web performance and efficiency.
 theclimatecommsproject.org supports HTTP/2
     
Verifying HTTP/2.0 Support. Please wait...

Http Header

HTTP headers are extra portions of records despatched among a consumer (which include an internet browser) and a server at some stage in an HTTP request or response. They offer instructions, metadata, or manipulate parameters for the conversation among the consumer and server.
content-type: text/html; charset=UTF-8
x-ws-ratelimit-limit: 1000
x-ws-ratelimit-remaining: 998
date: Thu, 02 Oct 2025 21:57:23 GMT
server: Apache
x-powered-by: PHP/7.3.33
link: <https://theclimatecommsproject.org/wp-json/>; rel="https://api.w.org/", <https://wp.me/9wkyG>; rel=shortlink
content-encoding: gzip

DNS Lookup

DNS entries (Domain Name System) are a critical component of the Internet infrastructure. They act as directories that translate human-readable domain names (such as example.com) to machine-readable IP addresses. DNS records are stored on DNS servers and help forward internet traffic efficiently.
Type Ip Target/Txt TTL
A 217.160.0.69 3600
AAAA 2001:8d8:100f:f000::256 3600
MX mx00.ionos.co.uk 3600
MX mx01.ionos.co.uk 3600
NS ns1114.ui-dns.com 3600
NS ns1114.ui-dns.de 3600
NS ns1098.ui-dns.org 3600
NS ns1070.ui-dns.biz 3600
TXT v=spf1 include:_spf-eu.ionos.com ~all 3600
SOA 86400
Mname ns1114.ui-dns.de
Rname hostmaster.1and1.com
Serial Number 2017122011
Refresh 28800
Retry 7200
Expire 604800
Minimum TTL 300