Msprojects.com.sg
MS ProjectsDomain Summary
What is the traffic rank for Msprojects.com.sg?
• Msprojects.com.sg ranks #6,531,666 globally on HypeStat.
What percent of global Internet users visit Msprojects.com.sg?
• 2.0E-7% of global Internet users visit Msprojects.com.sg
How many people visit Msprojects.com.sg each day?
• Msprojects.com.sg receives approximately 9 visitors and 0 page impressions per day.
How much Msprojects.com.sg can earn?
• Msprojects.com.sg should earn about $0.04/day from advertising revenue.
What is Msprojects.com.sg estimated value?
• Estimated value of Msprojects.com.sg is $27.22.
What IP addresses does Msprojects.com.sg resolve to?
• Msprojects.com.sg resolves to the IP addresses 119.31.232.100.
Where are Msprojects.com.sg servers located in?
• Msprojects.com.sg has servers located in Singapore.
msprojects.com.sg Profile
Title:MS Projects
What technologies does msprojects.com.sg use?
These are the technologies used at msprojects.com.sg. msprojects.com.sg has a total of 14 technologies installed in 13 different categories.msprojects.com.sg Traffic Analysis
Msprojects.com.sg is ranked #6,531,666 in the world. This website is viewed by an estimated 9 visitors daily, generating a total of 0 pageviews. This equates to about 272.7 monthly visitors.Daily Visitors9
Monthly Visits272.7
Pages per Visit n/a
Visit duration n/a
Bounce Rate n/a
Is this your site?Verify your site's metrics.
- Daily Unique Visitors:
- 9
- Monthly Visits:
- 273
- Pages per Visit:
- n/a
- Daily Pageviews:
- n/a
- Avg. visit duration:
- n/a
- Bounce rate:
- n/a
- Global Reach:
- 2.0E-7%
- Monthly Visits (SEMrush):
- 262
- Monthly Unique Visitors (SEMrush):
- 259
- HypeRank:
- 6,531,666
Desktop vs Mobile
- Desktop:
- 100.00%
- Mobile:
- 0%
Backlinks Report ▼
Msprojects.com.sg has a total of 48 backlinks from 40 referring domains and most of them comes from United States.- Total Backlinks:
- 48
- Follow Links:
- n/a
- Nofollow Links:
- n/a
- Referring Domains:
- 40
- Referring IPs:
- 8
- Authority Domain Score:
- 6
Backlinks by country
- Country
- Domains
- United States 37
- United Kingdom 1
Backlinks by TLDs
- TLD Distribution
- Domains
- .pw
- 26
- .com
- 8
- .shop
- 1
- .edu
- 0
- .gov
- 0
Last update was 274 days ago
This can take up to 60 seconds. Please wait...
This can take up to 60 seconds. Please wait...
*HypeStat.com is not promoting or affiliated with msprojects.com.sg in any way. Only publicly available statistics data are displayed.
Search Engine Indexes ▼
Search engine indexes are huge databases or collections of net pages that search engines like google like google and yahoo use to retrieve applicable facts while customers carry out searches. These indexes are created through search engines like google and yahoo through crawling and indexing net pages from throughout the internet.- Google Index:
- 10
- Bing Index:
- 24
▼
SEMrush is a complete on line advertising and marketing platform that gives a extensive variety of gear and functions to help companies and entrepreneurs in enhancing their on line visibility and optimizing their virtual advertising and marketing strategies.- Domain:
- msprojects.com.sg
- Rank:
(Rank based on keywords, cost and organic traffic) - n/a
- Organic Keywords:
(Number of keywords in top 20 Google SERP) - 0
- Organic Traffic:
(Number of visitors coming from top 20 search results) - 0
- Organic Cost:
((How much need to spend if get same number of visitors from Google Adwords) - $0.00
Revenue report ▼
Google.com would generate approximately $0 per day if the source of income were advertisements, which equates to an estimated monthly revenue of $1.2 and annual gross revenue of approximately $14.6. Based on these figures, the site's net worth is estimated at around $27.2.How much would msprojects.com.sg make?
- Daily Revenue:
- $0.04
- Monthly Revenue:
- $1.20
- Yearly Revenue:
- $14.60
How much is msprojects.com.sg worth?
- Website Value:
- $27.2
Ad Experience Report ▼
Summary of the ad experience rating of a website for a specific platform.Mobile summary
- Root domain:
- msprojects.com.sg
- Ad filtering:
(Chrome is not filtering ads on your site.) - Off
- Status:
(The status of the site that is reviewed for the Better Ads Standards.) - Not reviewed
Desktop summary
- Root domain:
- msprojects.com.sg
- Ad filtering:
(Chrome is not filtering ads on your site.) - Off
- Status:
(The status of the site that is reviewed for the Better Ads Standards.) - Not reviewed
Abusive Experience Report ▼
Summary of the abusive experience rating of a website.- Root domain:
- msprojects.com.sg
- Enforcement:
(Chrome is not preventing your site from opening new windows or tabs.) - Off
- Status:
(The status of the site reviewed for the abusive experiences.) - Not reviewed
Where is msprojects.com.sg hosted? ▼
Msprojects.com.sg may be hosted in multiple data centers distributed in different locations around the world. This is probably just one of them.- Server IP:
- 119.31.232.100
- ASN:
- AS38719
- ISP:
- Dreamscape Networks Limited
- Server Location:
Singapore, SG
Other sites hosted on 119.31.232.100
How fast does msprojects.com.sg load? ▼
The average loading time of msprojects.com.sg is 4136 ms.- Average Load Time:
- 4136 ms
Does msprojects.com.sg use compression? ▼
Website compression is the process of reducing the size of website files, such as HTML, CSS, JavaScript, and image files, to improve website performance and load times. Compressing website files can significantly reduce the amount of data that needs to be transferred from the server to the user's browser, resulting in faster page load times and improved user experience. Files on msprojects.com.sg are reduced by 83%.
msprojects.com.sg use gzip compression.
Original size: 257.89 KB
Compressed size: 42.79 KB
File reduced by: 215.11 KB (83%)
Compressed size: 42.79 KB
File reduced by: 215.11 KB (83%)
Google Safe Browsing ▼
Google Safe Browsing is a service provided by Google that helps protect users from visiting websites that may contain malicious or harmful content, such as malware, phishing attempts, or deceptive software.SSL Checker - SSL Certificate Verify ▼
An SSL (Secure Sockets Layer) certificate is a digital certificate that establishes a secure encrypted connection between a web server and a user's web browser. It provides authentication and encryption, ensuring that data transmitted between the server and the browser remains private and protected. msprojects.com.sg supports HTTPS. msprojects.com.sg supports HTTPS
Verifying SSL Support. Please wait...
Common Name: msprojects.com.sg
Organization:
Location:
Issuer: "cPanel, Inc. Certification Authority"
Valid from: Jul 22 00:00:00 2023 GMT
Valid until: Oct 20 23:59:59 2023 GMT
Authority: CA:FALSE
Keysize: 2048 Bits
Organization:
Location:
Issuer: "cPanel, Inc. Certification Authority"
Valid from: Jul 22 00:00:00 2023 GMT
Valid until: Oct 20 23:59:59 2023 GMT
Authority: CA:FALSE
Keysize: 2048 Bits
Common Name: "cPanel, Inc. Certification Authority"
Organization: "cPanel, Inc."
Location: Houston, TX, US
Issuer: COMODO RSA Certification Authority
Valid from: May 18 00:00:00 2015 GMT
Valid until: May 17 23:59:59 2025 GMT
Authority: CA:TRUE
Keysize: 2048 Bits
Organization: "cPanel, Inc."
Location: Houston, TX, US
Issuer: COMODO RSA Certification Authority
Valid from: May 18 00:00:00 2015 GMT
Valid until: May 17 23:59:59 2025 GMT
Authority: CA:TRUE
Keysize: 2048 Bits
Common Name: COMODO RSA Certification Authority
Organization: COMODO CA Limited
Location: Salford, Greater Manchester, GB
Issuer: AAA Certificate Services
Valid from: Jan 1 00:00:00 2004 GMT
Valid until: Dec 31 23:59:59 2028 GMT
Authority: CA:TRUE
Keysize: 4096 Bits
Organization: COMODO CA Limited
Location: Salford, Greater Manchester, GB
Issuer: AAA Certificate Services
Valid from: Jan 1 00:00:00 2004 GMT
Valid until: Dec 31 23:59:59 2028 GMT
Authority: CA:TRUE
Keysize: 4096 Bits
Verify HTTP/2 Support ▼
HTTP/2 (Hypertext Transfer Protocol version 2) is a major revision of the HTTP protocol, which is the foundation of data communication on the World Wide Web. It was developed as an improvement over the previous HTTP/1.1 version to enhance web performance and efficiency. msprojects.com.sg supports HTTP/2
Verifying HTTP/2.0 Support. Please wait...
Http Header ▼
HTTP headers are extra portions of records despatched among a consumer (which include an internet browser) and a server at some stage in an HTTP request or response. They offer instructions, metadata, or manipulate parameters for the conversation among the consumer and server.link: <https://msprojects.com.sg/wp-json/>; rel="https://api.w.org/", <https://msprojects.com.sg/wp-json/wp/v2/pages/16>; rel="alternate"; type="application/json", <https://msprojects.com.sg/>; rel=shortlink
vary: Accept-Encoding
content-encoding: gzip
content-length: 43814
content-type: text/html; charset=UTF-8
date: Thu, 21 Sep 2023 11:37:36 GMT
server: Apache
DNS Lookup ▼
DNS entries (Domain Name System) are a critical component of the Internet infrastructure. They act as directories that translate human-readable domain names (such as example.com) to machine-readable IP addresses. DNS records are stored on DNS servers and help forward internet traffic efficiently.Type | Ip | Target/Txt | TTL |
HINFO | 3600 | ||
A | 119.31.232.100 | 14303 | |
NS | 3502 | ||
NS | 3502 |
Whois Lookup ▼
Domain WHOIS is a public database that provides information about domain names, including registered owners, contact information, domain registrars, registration and expiration dates, name servers, and other relevant information. Domain registration for this website began on March 18, 2021 and will expire on March 18, 2024 if not renewed. This website is now assigned through the registrar DREAMSCAPE NETWORKS INTERNATIONAL PTE LTD. The WHOIS data for this website's domain was last updated on April 7, 2023.- Domain Created:
- 2021-03-18
- Domain Expires:
- 2024-03-18
- Domain Updated:
- 2023-04-07
- Domain Age:
- 3 years 3 months 4 days
- Domain Registrar:
- DREAMSCAPE NETWORKS INTERNATIONAL PTE LTD
- Domain Owner:
- MS PROJECTS PTE. LTD. (SGNIC-ORG1887290)
- WhoIs:
---------------------------------------------------------------------- SGNIC WHOIS Server ---------------------------------------------------------------------- The following data is provided for information purposes only. Registrar: DREAMSCAPE NETWORKS INTERNATIONAL PTE LTD Domain Name: MSPROJECTS.COM.SG Creation Date: 18-Mar-2021 16:39:12 Modified Date: 07-Apr-2023 08:41:54 Expiration Date: 18-Mar-2024 16:39:12 Domain Status: OK Domain Status: VerifiedID@SG-Mandatory Domain Status: VerifiedID@SG-OK (VERIFIED BY ADMIN CONTACT) Registrant: Name: MS PROJECTS PTE. LTD. (SGNIC-ORG1887290) Administrative Contact: Name: DREAMSCAPE NETWORKS INTERNATIONAL PTE. LTD. (SGNIC-ORG1487658) Technical Contact: Name: DOMAIN ADMINISTRATOR (SGNIC-PER20245044) Email: Name Servers: NS1.VODIEN.COM NS2.VODIEN.COM DNSSEC: unsigned