Msproject.com
Plan Manage Deliver | Microsoft ProjectDomain Summary
What is the traffic rank for Msproject.com?
• Msproject.com ranks #3,204,581 globally on HypeStat.
What percent of global Internet users visit Msproject.com?
• 1.9E-5% of global Internet users visit Msproject.com
How many people visit Msproject.com each day?
• Msproject.com receives approximately 0.9K visitors and 1,218 page impressions per day.
How much Msproject.com can earn?
• Msproject.com should earn about $4.97/day from advertising revenue.
What is Msproject.com estimated value?
• Estimated value of Msproject.com is $4,638.64.
What IP addresses does Msproject.com resolve to?
• Msproject.com resolves to the IP addresses 2001:8d8:1001:2244:6445:243b:ff5d:6011, 217.160.230.249.
Where are Msproject.com servers located in?
• Msproject.com has servers located in Germany.
msproject.com Profile
Title:Plan Manage Deliver | Microsoft Project
Description:Prioritize the right initiatives, resource them effectively and monitor progress to deliver strong business results with Microsoft Project & Portfolio Management (PPM).
Tags:
What technologies does msproject.com use?
These are the technologies used at msproject.com. msproject.com has a total of 2 technologies installed in 1 different categories.msproject.com Traffic Analysis
Msproject.com is ranked #3,204,581 in the world. This website is viewed by an estimated 0.9K visitors daily, generating a total of 1.2K pageviews. This equates to about 28.4K monthly visitors.Daily Visitors0.9K
Monthly Visits28.4K
Pages per Visit1.30
Visit duration n/a
Bounce Rate n/a
Is this your site?Verify your site's metrics.
- Daily Unique Visitors:
- 937
- Monthly Visits:
- 28,391
- Pages per Visit:
- 1.30
- Daily Pageviews:
- 1,218
- Avg. visit duration:
- n/a
- Bounce rate:
- n/a
- Global Reach:
- 1.9E-5%
- HypeRank:
- 3,204,581
Backlinks Report ▼
Msproject.com has a total of 61 backlinks from 28 referring domains.- Total Backlinks:
- 61
- Follow Links:
- 49
- Nofollow Links:
- 12
- Referring Domains:
- 28
- Referring IPs:
- 28
- Authority Domain Score:
- 1
Last update was 1304 days ago
This can take up to 60 seconds. Please wait...
This can take up to 60 seconds. Please wait...
*HypeStat.com is not promoting or affiliated with msproject.com in any way. Only publicly available statistics data are displayed.
Moz Data ▼
Domain Authority (DA) is a metric developed by Moz. DA is a score that predicts the ranking potential of a website on search engine result pages (SERPs). Moz calculates Domain Authority on a logarithmic scale from 1 to 100, with higher scores indicating a greater likelihood of ranking well in search results. Moz Domain Authority of msproject.com is 27.- Domain Authority:
- 27
- Page Authority:
- 30
- MozRank:
- n/a
▼
SEMrush is a complete on line advertising and marketing platform that gives a extensive variety of gear and functions to help companies and entrepreneurs in enhancing their on line visibility and optimizing their virtual advertising and marketing strategies.- Domain:
- msproject.com
- Rank:
(Rank based on keywords, cost and organic traffic) - n/a
- Organic Keywords:
(Number of keywords in top 20 Google SERP) - 0
- Organic Traffic:
(Number of visitors coming from top 20 search results) - 0
- Organic Cost:
((How much need to spend if get same number of visitors from Google Adwords) - $0.00
Revenue report ▼
Google.com would generate approximately $5 per day if the source of income were advertisements, which equates to an estimated monthly revenue of $149.1 and annual gross revenue of approximately $1.8K. Based on these figures, the site's net worth is estimated at around $4.6K.How much would msproject.com make?
- Daily Revenue:
- $4.97
- Monthly Revenue:
- $149.10
- Yearly Revenue:
- $1,814.05
How much is msproject.com worth?
- Website Value:
- $4.6K
Ad Experience Report ▼
Summary of the ad experience rating of a website for a specific platform.Mobile summary
- Root domain:
- msproject.com
- Ad filtering:
(Chrome is not filtering ads on your site.) - Off
- Status:
(The status of the site that is reviewed for the Better Ads Standards.) - Not reviewed
Desktop summary
- Root domain:
- msproject.com
- Ad filtering:
(Chrome is not filtering ads on your site.) - Off
- Status:
(The status of the site that is reviewed for the Better Ads Standards.) - Not reviewed
Abusive Experience Report ▼
Summary of the abusive experience rating of a website.- Root domain:
- msproject.com
- Enforcement:
(Chrome is not preventing your site from opening new windows or tabs.) - Off
- Status:
(The status of the site reviewed for the abusive experiences.) - Not reviewed
Where is msproject.com hosted? ▼
Msproject.com may be hosted in multiple data centers distributed in different locations around the world. This is probably just one of them.- Server IP:
- 2001:8d8:1001:2244:6445:243b:ff5d:6011, 217.160.230.249
- ASN:
- AS8560
- ISP:
- 1&1 Internet SE
- Server Location:
Germany
Other sites hosted on 217.160.230.249
How fast does msproject.com load? ▼
The average loading time of msproject.com is 2031 ms.- Average Load Time:
- 2031 ms
Does msproject.com use compression? ▼
Website compression is the process of reducing the size of website files, such as HTML, CSS, JavaScript, and image files, to improve website performance and load times. Compressing website files can significantly reduce the amount of data that needs to be transferred from the server to the user's browser, resulting in faster page load times and improved user experience. Files on msproject.com are reduced by %.
msproject.com does not use compression.
Original size: n/a
Compressed size: n/a
File reduced by: (%)
Compressed size: n/a
File reduced by: (%)
Google Safe Browsing ▼
Google Safe Browsing is a service provided by Google that helps protect users from visiting websites that may contain malicious or harmful content, such as malware, phishing attempts, or deceptive software.
This site is not currently listed as suspicious
MyWot.com Reputation Ratings
MyWOT (short for "My Web of Trust") is a web-based reputation and rating service that provides users with information about the trustworthiness and safety of websites. msproject.com has 66 Safety Reputations.- Status:
- SAFE
- Safety Reputations:
- 66
- Safety Confidence:
- 9
SSL Checker - SSL Certificate Verify ▼
An SSL (Secure Sockets Layer) certificate is a digital certificate that establishes a secure encrypted connection between a web server and a user's web browser. It provides authentication and encryption, ensuring that data transmitted between the server and the browser remains private and protected. msproject.com does not support HTTPS. msproject.com does not support HTTPS
Verifying SSL Support. Please wait...
Verify HTTP/2 Support ▼
HTTP/2 (Hypertext Transfer Protocol version 2) is a major revision of the HTTP protocol, which is the foundation of data communication on the World Wide Web. It was developed as an improvement over the previous HTTP/1.1 version to enhance web performance and efficiency. msproject.com does not support HTTP/2
Verifying HTTP/2.0 Support. Please wait...
Http Header ▼
HTTP headers are extra portions of records despatched among a consumer (which include an internet browser) and a server at some stage in an HTTP request or response. They offer instructions, metadata, or manipulate parameters for the conversation among the consumer and server.HTTP/1.1 302 Found
Content-Type: text/html; charset=iso-8859-1
Content-Length: 234
Connection: close
Date: Mon, 20 Mar 2017 14:59:41 GMT
Server: Apache
Location: https://www.microsoft.com/en-ie/planmanagedeliver/
HTTP/1.0 200 OK
Cache-Control: no-cache, no-store
Pragma: no-cache
Content-Length: 83894
Content-Type: text/html
Expires: -1
Server: Microsoft-IIS/8.0
P3P: CP="ALL IND DSP COR ADM CONo CUR CUSo IVAo IVDo PSA PSD TAI TELo OUR SAMo CNT COM INT NAV ONL PHY PRE PUR UNI"
CorrelationVector: WWElIgOs/EGKzbnk.1.2
X-AspNet-Version: 4.0.30319
X-Powered-By: ASP.NET
Access-Control-Allow-Headers: Origin, X-Requested-With, Content-Type, Accept
Access-Control-Allow-Methods: GET, POST, PUT, DELETE, OPTIONS
Access-Control-Allow-Credentials: true
X-Frame-Options: SAMEORIGIN
X-Powered-By: ARR/2.5
X-Powered-By: ASP.NET
X-EdgeConnect-Origin-MEX-Latency: 714
Date: Mon, 20 Mar 2017 14:59:45 GMT
Connection: close
Set-Cookie: MS-CV=WWElIgOs/EGKzbnk.1; domain=.microsoft.com; expires=Tue, 21-Mar-2017 14:59:45 GMT; path=/
Set-Cookie: MS-CV=WWElIgOs/EGKzbnk.2; domain=.microsoft.com; expires=Tue, 21-Mar-2017 14:59:45 GMT; path=/
Strict-Transport-Security: max-age=31536000
X-CCC: US
X-CID: 2
DNS Lookup ▼
DNS entries (Domain Name System) are a critical component of the Internet infrastructure. They act as directories that translate human-readable domain names (such as example.com) to machine-readable IP addresses. DNS records are stored on DNS servers and help forward internet traffic efficiently.Type | Ip | Target/Txt | TTL |
AAAA | 2001:8d8:1001:2244:6445:243b:ff5d:6011 | 3600 | |
MX | 3600 | ||
MX | 3600 | ||
SOA | 3600 | ||
Mname | ns59.1and1.co.uk | ||
Rname | hostmaster.1and1.co.uk | ||
Serial Number | 2016120705 | ||
Refresh | 28800 | ||
Retry | 7200 | ||
Expire | 604800 | ||
Minimum TTL | 600 | ||
A | 217.160.230.249 | 3600 | |
NS | 3573 | ||
NS | 3573 |
Whois Lookup ▼
Domain WHOIS is a public database that provides information about domain names, including registered owners, contact information, domain registrars, registration and expiration dates, name servers, and other relevant information. Domain registration for this website began on October 10, 1996 and will expire on May 9, 2024 if not renewed. This website is now assigned through the registrar . The WHOIS data for this website's domain was last updated on May 9, 2024.- Domain Created:
- 1996-10-10
- Domain Age:
- 27 years 6 months 30 days
- WhoIs:
whois lookup at whois.1and1.com...Domain Name: msproject.com Registry Domain ID: 1883836_DOMAIN_COM-VRSN Registrar WHOIS Server: whois.1and1.com Registrar URL: http://1and1.com Updated Date: 2016-12-07T15:04:10.000Z Creation Date: 1996-10-10T04:00:00.000Z Registrar Registration Expiration Date: 2017-10-09T04:00:00.000Z Registrar: 1&1 Internet SE Registrar IANA ID: 83 Registrar Abuse Contact Email: Registrar Abuse Contact Phone: +1.8774612631 Reseller: Domain Status: clientTransferProhibited https://www.icann.org/epp#clientTransferProhibited Registry Registrant ID: Registrant Name: Jeff Dean Registrant Organization: Webinteractive Registrant Street: Admirals Way Registrant Street: Beaufort Court Registrant City: London Registrant State/Province: Registrant Postal Code: E14 9XL Registrant Country: GB Registrant Phone: +44.2078637500 Registrant Phone Ext: Registrant Fax: Registrant Fax Ext: Registrant Email: Registry Admin ID: Admin Name: Jeff Dean Admin Organization: Webinteractive Admin Street: Admirals Way Admin Street: Beaufort Court Admin City: London Admin State/Province: Admin Postal Code: E14 9XL Admin Country: GB Admin Phone: +44.2078637500 Admin Phone Ext: Admin Fax: Admin Fax Ext: Admin Email: Registry Tech ID: Tech Name: Hostmaster ONEANDONE Tech Organization: 1&1 Internet Ltd. Tech Street: Discovery House Tech Street: 154 Southgate Street Tech City: Gloucester Tech State/Province: GLS Tech Postal Code: GL1 2EX Tech Country: GB Tech Phone: +44.3333365691 Tech Phone Ext: Tech Fax: +49.72191374215 Tech Fax Ext: Tech Email: Nameserver: ns59.1and1.co.uk Nameserver: ns60.1and1.co.uk DNSSEC: Unsigned URL of the ICANN WHOIS Data Problem Reporting System: http://wdprs.internic.net/ >>> Last update of WHOIS database: 2017-03-20T14:59:58Z <<< For more information on Whois status codes, please visit https://icann.org/eppwhois lookup at whois.crsnic.net...Whois Server Version 2.0 Domain names in the .com and .net domains can now be registered with many different competing registrars. Go to http://www.internic.net for detailed information. Domain Name: MSPROJECT.COM Registrar: 1&1 INTERNET SE Sponsoring Registrar IANA ID: 83 Whois Server: whois.1and1.com Referral URL: http://registrar.1and1.info Name Server: NS59.1AND1.CO.UK Name Server: NS60.1AND1.CO.UK Status: clientTransferProhibited https://icann.org/epp#clientTransferProhibited Updated Date: 07-dec-2016 Creation Date: 10-oct-1996 Expiration Date: 09-oct-2017 >>> Last update of whois database: Mon, 20 Mar 2017 14:59:41 GMT <<< For more information on Whois status codes, please visit https://icann.org/epp NOTICE: The expiration date displayed in this record is the date the registrar's sponsorship of the domain name registration in the registry is currently set to expire. This date does not necessarily reflect the expiration date of the domain name registrant's agreement with the sponsoring registrar. Users may consult the sponsoring registrar's Whois database to view the registrar's reported date of expiration for this registration. TERMS OF USE: You are not authorized to access or query our Whois database through the use of electronic processes that are high-volume and automated except as reasonably necessary to register domain names or modify existing registrations; the Data in VeriSign Global Registry Services' ("VeriSign") Whois database is provided by VeriSign for information purposes only, and to assist persons in obtaining information about or related to a domain name registration record. VeriSign does not guarantee its accuracy. By submitting a Whois query, you agree to abide by the following terms of use: You agree that you may use this Data only for lawful purposes and that under no circumstances will you use this Data to: (1) allow, enable, or otherwise support the transmission of mass unsolicited, commercial advertising or solicitations via e-mail, telephone, or facsimile; or (2) enable high volume, automated, electronic processes that apply to VeriSign (or its computer systems). The compilation, repackaging, dissemination or other use of this Data is expressly prohibited without the prior written consent of VeriSign. You agree not to use electronic processes that are automated and high-volume to access or query the Whois database except as reasonably necessary to register domain names or modify existing registrations. VeriSign reserves the right to restrict your access to the Whois database in its sole discretion to ensure operational stability. VeriSign may restrict or terminate your access to the Whois database for failure to abide by these terms of use. VeriSign reserves the right to modify these terms at any time. The Registry database contains ONLY .COM, .NET, .EDU domains and Registrars.