jmsprojects.ca Jmsprojects.ca

   
JMS PROJECTS & DESIGN

Domain Summary

What IP addresses does Jmsprojects.ca resolve to?

• Jmsprojects.ca resolves to the IP addresses 198.185.159.144.

Where are Jmsprojects.ca servers located in?

• Jmsprojects.ca has servers located in United States.

jmsprojects.ca Profile

Title:JMS PROJECTS & DESIGN Description:JMS Projects is a residential and commercial renovation and design company located in Vancouver, BC. We specialize in renovations and modern design and are passionate about creating beautiful spaces that are meant to be lived in. As a family-run business, we understand the importance of making your house feel like home.

What technologies does jmsprojects.ca use?

These are the technologies used at jmsprojects.ca. jmsprojects.ca has a total of 8 technologies installed in 7 different categories.

jmsprojects.ca Traffic Analysis

There's no enough data about jmsprojects.ca traffic.
Daily Visitors n/a
Monthly Visits n/a
Pages per Visit n/a
Visit duration n/a
Bounce Rate n/a
Is this your site?Verify your site's metrics.
Daily Unique Visitors:
 n/a
Monthly Visits:
n/a
Pages per Visit:
n/a
Daily Pageviews:
n/a
Avg. visit duration:
n/a
Bounce rate:
n/a
Global Reach:
 n/a
HypeRank:
n/a
*All traffic values are estimates only.

Total Visits Last 3 Months

624
JUL
0
AUG
0
SEP
Last update was 2 hours ago
     
This can take up to 60 seconds. Please wait...

Update will be available in 22 hours
*HypeStat.com is not promoting or affiliated with jmsprojects.ca in any way. Only publicly available statistics data are displayed.

 

SEMrush is a complete on line advertising and marketing platform that gives a extensive variety of gear and functions to help companies and entrepreneurs in enhancing their on line visibility and optimizing their virtual advertising and marketing strategies.
SemRushSemRush
Domain:
  jmsprojects.ca
Rank:
(Rank based on keywords, cost and organic traffic)
  n/a
Organic Keywords:
(Number of keywords in top 20 Google SERP)
  0
Organic Traffic:
(Number of visitors coming from top 20 search results)
  0
Organic Cost:
((How much need to spend if get same number of visitors from Google Adwords)
  $0.00

Ad Experience Report

Summary of the ad experience rating of a website for a specific platform.

Mobile summary

Root domain:
jmsprojects.ca
Ad filtering:
(Chrome is not filtering ads on your site.)
Off
Status:
(The status of the site that is reviewed for the Better Ads Standards.)
Not reviewed

Desktop summary

Root domain:
jmsprojects.ca
Ad filtering:
(Chrome is not filtering ads on your site.)
Off
Status:
(The status of the site that is reviewed for the Better Ads Standards.)
Not reviewed

Abusive Experience Report

Summary of the abusive experience rating of a website.
Root domain:
jmsprojects.ca
Enforcement:
(Chrome is not preventing your site from opening new windows or tabs.)
Off
Status:
(The status of the site reviewed for the abusive experiences.)
Not reviewed

Where is jmsprojects.ca hosted?

Jmsprojects.ca may be hosted in multiple data centers distributed in different locations around the world. This is probably just one of them.
Server IP:
198.185.159.144
ASN:
AS53831 
ISP:
Squarespace, Inc. 
Server Location:

United States, US
 

Other sites hosted on 198.185.159.144

How fast does jmsprojects.ca load?

The average loading time of jmsprojects.ca is 472 ms.
Average Load Time:
472 ms

Does jmsprojects.ca use compression?

Website compression is the process of reducing the size of website files, such as HTML, CSS, JavaScript, and image files, to improve website performance and load times. Compressing website files can significantly reduce the amount of data that needs to be transferred from the server to the user's browser, resulting in faster page load times and improved user experience. Files on jmsprojects.ca are reduced by 85%.
jmsprojects.ca use gzip compression.
Original size: 312.55 KB
Compressed size: 45.71 KB
File reduced by: 266.84 KB (85%)

Google Safe Browsing

Google Safe Browsing is a service provided by Google that helps protect users from visiting websites that may contain malicious or harmful content, such as malware, phishing attempts, or deceptive software.
This site is not currently listed as suspicious

MyWot.com Reputation Ratings

MyWOT (short for "My Web of Trust") is a web-based reputation and rating service that provides users with information about the trustworthiness and safety of websites.
Status:
  SAFE

SSL Checker - SSL Certificate Verify

An SSL (Secure Sockets Layer) certificate is a digital certificate that establishes a secure encrypted connection between a web server and a user's web browser. It provides authentication and encryption, ensuring that data transmitted between the server and the browser remains private and protected. jmsprojects.ca supports HTTPS.
 jmsprojects.ca supports HTTPS
     
Verifying SSL Support. Please wait...
Common Name: www.jmsprojects.ca
Organization:
Location:
Issuer: R13
Valid from: Sep 8 13:53:28 2025 GMT
Valid until: Dec 7 13:53:27 2025 GMT
Authority: CA:FALSE
Keysize: 2048 Bits
Common Name: R13
Organization: Let's Encrypt
Location: US
Issuer: ISRG Root X1
Valid from: Mar 13 00:00:00 2024 GMT
Valid until: Mar 12 23:59:59 2027 GMT
Authority: CA:TRUE
Keysize: 2048 Bits

Verify HTTP/2 Support

HTTP/2 (Hypertext Transfer Protocol version 2) is a major revision of the HTTP protocol, which is the foundation of data communication on the World Wide Web. It was developed as an improvement over the previous HTTP/1.1 version to enhance web performance and efficiency.
 jmsprojects.ca supports HTTP/2
     
Verifying HTTP/2.0 Support. Please wait...

Http Header

HTTP headers are extra portions of records despatched among a consumer (which include an internet browser) and a server at some stage in an HTTP request or response. They offer instructions, metadata, or manipulate parameters for the conversation among the consumer and server.
age: 0
date: Sun, 19 Oct 2025 12:40:02 GMT
location: https://www.jmsprojects.ca/
server: Squarespace
set-cookie: crumb=BW1a3S+FBjP4YjVkYzRiYzUzYTE4NmU5NjQ0YTg1YTJjMDZiYzlj;Secure;Path=/
strict-transport-security: max-age=0
x-contextid: KidUpoUP/XYUiNM6a
content-length: 0

HTTP/2 200 
accept-ranges: bytes
age: 28004
content-encoding: gzip
content-type: text/html;charset=utf-8
date: Sun, 19 Oct 2025 02:21:12 GMT
etag: W/"38dd9834d5e1e7bff9832c75256144f7--gzip"
expires: Thu, 01 Jan 1970 00:00:00 GMT
server: Squarespace
set-cookie: crumb=BWFqEpWRlwIONjVlMWE3NDhkZjRiYTlhYjEyYTM5Y2U4YTQ5YmJm;Secure;Path=/
strict-transport-security: max-age=0
vary: Accept-Encoding
x-content-type-options: nosniff
x-contextid: RCDhglYp/XTcHZRCL
content-length: 46811

DNS Lookup

DNS entries (Domain Name System) are a critical component of the Internet infrastructure. They act as directories that translate human-readable domain names (such as example.com) to machine-readable IP addresses. DNS records are stored on DNS servers and help forward internet traffic efficiently.
Type Ip Target/Txt TTL
HINFO 3600